UK rail and overhead-line electrification
Lift planning for UK rail and OLE.
Varentius is being designed so appointed persons and planning teams can issue a UK lift-plan and RAMS pack — including a QR code to the live revision, briefing sign-off and revision control — in rail and overhead-line electrification (OLE) contexts as well as general construction.
This page does not claim that Varentius is approved, endorsed or mandated by Network Rail, or that the software makes a possession, isolation or lift “safe”. Site rules, asset-owner procedures and the appointed person’s judgement remain decisive.
What we will emphasise in the rail workflow
- Clear recording of constraints, interfaces, access and electrical or operational limits that you enter.
- A pack that can sit alongside, not replace, the asset owner’s forms and rules.
- The same capacity-data rule as the rest of the product: an official chart supplied by the crane owner, an official planner link where the crane owner is entitled to use it, or a licensed API where a written agreement exists.
If you want Varentius consultancy on a rail or infrastructure project, use the project enquiry. If you want to use the software in a depot or planning office, apply for the founding pilot or read the indicative pricing.
Damien Proudlove · damien@varentius.com · 07396 671523