01 / General approach

Start with the strongest practical control

HSE sets out five broad levels, from removing a hazard to protecting an individual with PPE. Consider controls in that order, reduce risks to the lowest reasonably practicable level and use the risk assessment to decide what is effective for the actual task. A hierarchy is a way to organise the decision; it is not a substitute for assessing the work. HSE hierarchy guidance (opens in a new tab) and the HSE pop-up toilet safety notice (opens in a new tab) set out the order and its application.

  1. 01

    Elimination

    Avoid or remove the hazard. Ask whether the task, exposure or hazardous material can be designed out altogether. HSE describes elimination as physically removing the hazard. HSE hierarchy guidance (opens in a new tab)

  2. 02

    Substitution

    Change a tool, material or process for a less dangerous one. The replacement still needs its own risk assessment; a different method is not automatically safer. HSE hierarchy guidance (opens in a new tab) and HSE construction dust examples (opens in a new tab) describe substitution and alternative methods.

  3. 03

    Engineering controls

    Physically isolate people from the hazard. Examples include guards, interlocks, enclosures, extraction and collective protection. Where protection can be provided for everyone at risk, consider it ahead of controls that protect only an individual. HSE hierarchy guidance (opens in a new tab) and HSE accident-prevention guidance (opens in a new tab) describe these controls and priorities.

  4. 04

    Administrative and procedural controls

    Change how work is organised: safe systems, permits-to-work, procedures, management, training and supervision. These measures need to match the task and be communicated to the people carrying it out. HSE accident-prevention guidance (opens in a new tab) and HSE Administration guidance (opens in a new tab).

  5. 05

    Personal protective equipment (PPE)

    Treat PPE as the last resort in the hierarchy. Respiratory protective equipment (RPE), such as a suitable respirator, is also a final control option for hazardous-substance exposure; it may supplement other measures where residual risk remains. HSE PPE guidance (opens in a new tab) and HSE COSHH control guidance (opens in a new tab).

HSE describes controls higher in the hierarchy as generally more effective and more costly. Consider the risk and practicability together; do not treat cost alone as a reason to skip a reasonable preventive measure. The required mix can include several control levels. HSE accident-prevention guidance (opens in a new tab) and HSE COSHH guidance (opens in a new tab).

02 / Specific sequence

Work at height has eight levels

This is a specific sequence: avoid work at height, then consider three levels of prevention, followed by four levels of mitigation. HSE says to follow it systematically and move to the next level only when the current one is not reasonably practicable. A harness and lanyard for fall arrest is not the first choice. HSE work-at-height guidance (opens in a new tab) and HSG150 (opens in a new tab).

The examples below are the HSE sequence; they do not decide which option is suitable for a particular site or task.

Avoid

1

Avoid work at height

Avoid it unless essential. For example, erect guard rails on steel at ground level, then crane the steel and rails into position. HSE example (opens in a new tab)

Prevent falls — three levels

2

Use an existing safe place

Choose a place that needs no added work equipment to prevent a fall, such as a flat roof with permanent edge protection. HSE example (opens in a new tab)

3

Use collective work equipment

Prevent falls for everyone at risk with suitable equipment, for example a guard-railed scaffold, tower scaffold or MEWP. HSE examples (opens in a new tab)

4

Use individual work equipment

Where applicable, use equipment that prevents an individual reaching a fall position, such as a work-restraint system. HSE example (opens in a new tab)

Mitigate falls — four levels

5

Minimise distance and consequences with collective equipment

Use suitable nets or soft-landing systems close beneath the work surface. HSE example (opens in a new tab)

6

Minimise distance and consequences for the individual

Examples include a personal fall-arrest system with its anchor above the head, or a rope-access system. HSE examples (opens in a new tab)

7

Limit the consequences of a fall

Examples include nets at a lower level or inflatable injury-protection equipment. HSE examples (opens in a new tab)

8

Use training, instruction and other precautions

HSE examples include regular ladder inspections and competent use, warning demarcation, adequate lighting, good housekeeping and suitable footwear. HSE examples (opens in a new tab)

03 / Turning assessment into sequence

Carry each selected control into the work steps

Start with the actual work, site, people and interfaces in the risk assessment. Use the hierarchy to consider precautions in context, rather than completing every level as a formulaic checklist. Then draw the assessed hazards and chosen controls into the method statement’s work sequence. HSE describes the statement as a way to communicate risk and precautions, in a logical sequence that includes all control measures and resources. HSE work-at-height planning guidance (opens in a new tab) and HSE Administration guidance (opens in a new tab).

Risk in the assessment

Workers could be exposed to a fall while fitting edge protection to steelwork at height.

Selected control

Consider eliminating that exposure by assembling guard rails at ground level before craning the steel and rails into position, an HSE example.

Related method step

State the ground-level assembly step before the lift. Identify the equipment, resources, procedures, responsibilities and remaining lift controls from the project assessment.

This is an illustrative trace, not a project instruction. HSE lists ground-level guard-rail assembly as an example and says a method statement should communicate the controls for the particular job. HSE work-at-height guidance (opens in a new tab) and HSE Administration guidance (opens in a new tab).

  1. 01

    Identify

    Record the activity, hazards, who may be affected, site conditions and significant findings in the risk assessment.

  2. 02

    Choose

    Apply the relevant control hierarchy to the assessed risks. Explain why the chosen controls suit the task and what residual risk remains.

  3. 03

    Sequence

    Put the controls in the order workers need them, including access, set-up, hold points, normal work, completion and any safe change or stop arrangements.

  4. 04

    Resource and assign

    Name the required equipment, procedures, competent roles and responsibilities. Add simple sketches where they make the sequence clearer.

04 / Written arrangements

Demolition statements must precede the work

Before demolition, dismantling or structural alteration begins, the arrangements must be recorded in writing. HSE says this is usually done in a method statement, which can be generated from a risk assessment. A statement should describe the job in a logical sequence, include all controls and support planning with the necessary resources. HSE Administration guidance (opens in a new tab).

If circumstances change markedly, revise it; for demolition, issue a revised, job-specific statement for each job. Write for the people doing and supervising the work: be clear, avoid ambiguity or generalisations, and use simple sketches where useful. HSE says equipment needed for safe work should be identified and available before starting. HSE Administration guidance (opens in a new tab) and HSE method-statement guidance (opens in a new tab).

05 / Lifting operations

Make the lift plan a usable safe system

HSE says lifting operations must be properly planned by a competent person, appropriately supervised and carried out safely. The planner should have adequate practical and theoretical knowledge and experience. The plan addresses risks found by the assessment, required resources, procedures and responsibilities. HSE lifting-operations guidance (opens in a new tab) and L113 (opens in a new tab).

The HSE lifting-operations guidance identifies suitable lifting equipment, slinging and signalling, maintenance and examination, trained and competent people, supervision, required reports and documents, preventing unauthorised crane movement, and protecting people not involved in the lift. The crane supervisor directs the operation to the method statement and should have authority to stop it if it is dangerous to proceed. HSE lifting-operations guidance (opens in a new tab).

For pre-lift conditions, HSE’s lifting-procedures guidance calls out isolation, plant shutdown, permits-to-work, barriers and fencing to make the plant or area safe. It also identifies management systems to reduce human error through commissioning, installation, operation and decommissioning. That page cites PM55 (paragraphs 8–9) on adequately experienced and competent planning; the current L113 guidance also describes the planner’s required knowledge and experience. HSE lifting-procedures guidance and its PM55 reference (opens in a new tab) and L113 (opens in a new tab).

06 / Worked examples and people

Check the control works in the real task

Crushing risk beneath a raised pop-up toilet

HSE says a suitably rated engineering control should prevent a raised toilet lowering while someone accesses the chamber below. A pit prop, movable stop or stand is an example only when it can be securely fitted and locked in position. Consider access and clearance, limit the need to reach beneath the raised unit, maintain the control and provide clear instructions. HSE pop-up toilet safety notice (opens in a new tab).

Dust from construction work

First consider whether the dusty task can be removed or substituted. HSE examples include a block splitter instead of a cut-off saw, or a different method such as direct-fixing with a nail gun instead of drilling. If dust remains, assess suitable water or vacuum extraction; RPE may still be needed for high-risk tasks. Keep RPE as a last resort or supplementary measure for residual risk, not a replacement for effective source controls. HSE construction dust guidance (opens in a new tab) and HSE COSHH guidance (opens in a new tab).

Prevention, cost and long-term ill-health

In an HSE flour-dust case, using lower-dust flour and dust suppressants reduced exposure, allowed fewer mechanical controls and reduced the time and cost of extracting dust. HSE says to weigh sustained prevention against the true cost of ill-health. This is a flour-dust example, not evidence about a construction product; use the project assessment and applicable construction guidance for the actual material and process. HSE flour-dust case (opens in a new tab) and HSE construction dust guidance (opens in a new tab).

Write for the people who will use the method

Keep steps, controls and responsibilities easy to follow. HSE human-factors guidance says information presentation, perception, attention, decision-making, workload and work patterns can affect task performance. HSE links fatigue with reduced information processing, attention and risk awareness; it also identifies excessive demands, time pressure and unclear roles as potential sources of stress. Consider role clarity, workload, shifts and breaks when planning and communicating work. HSE human-factors guidance (opens in a new tab), HSE fatigue guidance (opens in a new tab) and HSE work-related stress guidance (opens in a new tab).

07 / Limits

Project conditions decide the controls

This guide is general information

It is not advice for a particular project, a competent-person review or approval, or authorisation to start work. Actual controls depend on the work, site, people, risks and changing conditions. A project-specific assessment and competent review remain necessary before work proceeds.

Review the assessment and method when the scope, site conditions, sequence, equipment or people change. Make sure the people carrying out the work understand the controls, know who is responsible and know when to stop and seek review. HSE expects work-at- height precautions to follow the actual risk assessment and lifting plans to account for foreseeable risks and competent supervision. HSE work-at-height guidance (opens in a new tab) and HSE lifting-operations guidance (opens in a new tab).

08 / Further reading

HSE source list

Direct HSE sources are linked beside the claims they support and collected here for further reading. The dispatch snapshot marked “RR1170 – High Rise Residential Buildings” unverified and supplied no URL, so it is not cited as evidence.

  1. Administration — HSE construction guidance (opens in a new tab)

    Written arrangements for demolition, method statements, risk assessments, revision and communication.

  2. Using personal protective equipment (PPE) to control risks at work — HSE (opens in a new tab)

    The five-level hierarchy from elimination through PPE.

  3. Topic area 2: Accident prevention — HSE (opens in a new tab)

    Engineering examples, collective protection priority and the effectiveness/cost caveat.

  4. Assessing all work at height — HSE construction guidance (opens in a new tab)

    The eight work-at-height levels, sequencing, examples and method-statement clarity.

  5. Health and safety in construction (HSG150) — HSE (opens in a new tab)

    Further construction guidance on the work-at-height hierarchy and method statements.

  6. Lifting operations — HSE construction guidance (opens in a new tab)

    Planning, competence, safe systems, examinations and supervision.

  7. Lifting procedures — HSE (opens in a new tab)

    Pre-lift isolation and site controls, lifecycle systems, and the HSE reference to PM55.

  8. Safe use of lifting equipment (L113) — HSE (opens in a new tab)

    LOLER guidance on competent planning, supervision and safe lifting.

  9. Pop-up toilets: Risk of crushing — HSE safety notice (opens in a new tab)

    The five levels applied to a raised toilet and chamber access.

  10. Dust — HSE construction FAQs (opens in a new tab)

    Construction dust alternatives, extraction and when RPE may still be needed.

  11. Principles of good control practice — HSE COSHH guidance (opens in a new tab)

    Control reliability, integrated measures and RPE as the final control option.

  12. HSE inspections tackling exposure to flour dust in bakeries — HSE (opens in a new tab)

    A flour-dust case on substitution, extraction effort and the long-term cost of ill-health.

  13. Introduction to human factors — HSE (opens in a new tab)

    Perception, attention, information, workload, work patterns and human limitations.

  14. Fatigue — HSE (opens in a new tab)

    Fatigue, workload, shift arrangements and their effects on attention and risk.

  15. Work-related stress and how to manage it — HSE (opens in a new tab)

    Work demands, role clarity, skills, time pressure and stress risk assessment.

HSE source pages were checked for the claims cited in this guide on 30 October 2026. HSE guidance can change; consult the current source and applicable requirements when planning work.